Wuxi Anber Machine Co., Ltd.
Products
Contact Us
  • Contact Person : Ms. Yin Jenny
  • Company Name : Wuxi Anber Machine Co., Ltd.
  • Tel : 86-0510-88239310
  • Address : Jiangsu,wuxi,NO 59 YANXIN ROAD YANQIAO INDUSTRIAL ZONE
  • Country/Region : China

Vertical pretreatment shower system for table leg powder coating line

Vertical pretreatment shower system for table leg powder coating line
Product Detailed
Related Categories:Metal Coating Machinery
This powder coating line is specially designed to provide surface treatment to supporting & decorative legs.

I. Description:

Powder coating is the application of paint in the form of tiny dry particles. Unlike traditional wet spray painting methods, we simply use a clean and efficient electrostatic powder coating process. The parts to be painted are given an electrostatic charge that is opposite to the charge given the powder. As the paint powder is sprayed onto these charged parts, the powder particles are naturally drawn towards this opposite charge. This process yields parts that are uniformly coated with a minimum expenditure of powder, which translates to a superior coating for less money than traditional wet spray methods. After the powder is initially applied, the parts are baked at specific temperatures in curing oven. Inside the oven, the plastic powder instantly turns from its solid powdered phase to liquid phase and finally cures into a solid phase. At the end of the process, there will be a durable plastic coating layer that is bonded directly to the metal.

II. Technical parameters

Name of workpiece: support legs for table, chair & desk2. Material of support legs: steel & iron3. Max hanging size on each hanger: L20mm×W50mm×H800mm4. Loading capacity on hanging hook: ≤30kg5. Suggested interval between 2 hangers: 200mm6. Conveying speed: 1m/min (Adjustable control)7. Output: 250-280pcs per hour8. Spraying method: 4 auto spray guns (match on 2 reciprocators) & 2 manual spray guns9. Heating source: natural gas (Other choices are available: electricity, oil or coal)10. Pretreatment system: Vertical shower typeIII. Process flow1. Feed your steel table & chair legs on this automatic powder coating line2. Degreasing stage (50-60 Celsuis for 2 mins)3. Rinsing stage (Room temperature for 1 min)4. Phosphating stage (50-60 Celsuis for 2 mins)5. Rinsing stage (Room temperature for 1-2 mins)6. Drying off oven to remove surface moisture (100-120 Celsuis for 10 mins)7. Powder application with spray guns8. Powder curing (180-200 Celsuis for 20 mins)9. Finished product dischargingIf above parameters cannot meet with your strict coating need, please contact us for more detail. We can make some adjustments or even improvements to suit your actual production conditions.

Vertical pretreatment shower system for table leg powder coating line



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.